The next day for Epro 8 we built a bridge which had to be 400mm wide and 700 mm tall. We had to make it stable so it would not fall. It was hard. We kept on thinking of how the bridge could be stable enough for a car to drive over it or a.
Today we started making a crane for Epro8 challange it was hard but we got it done. We had to build it so it could pick up a bag swing it around and place it in a different area. When we finished the crane it was able to moved around and picked up a bag. It was so cool.